CHALLANGES
PLN Indonesia Power, through its subsidiary, won the tender for the installation of a monitoring system for geothermal power plants from upstream to downstream. The short project completion period of just 1 month required IP personnel to work harder to ensure the project was completed on time. IP staff had to integrate 3 geothermal power plant units—Dieng, Dieng Small Scale, and Patuha—into a single real-time monitoring system