Relocation 2x100 MW Grati Gas Turbine to Bali

CHALLENGES

Relocating 2x100 MW gas turbines from the Grati Power Plant, which has been operational since 1997, to Bali to enhance system reliability. The project is targeted to be completed within 10 months. Identifying the equipment that needs to be replaced is crucial to ensure the relocation is completed on time.

SOLUTION

Conduct an assessment of the power plant equipment to identify which equipment can be reused and which needs to be replaced with new equipment. Subsequently, procure the replacement equipment as quickly as possible to reduce lead time.

The work can be carried out with thorough planning and preparation, minimizing the occurrence of variation orders that could delay project completion. The relocated power plant successfully undergoes commissioning and operates on time with good performance.